Daisy chaining is supported on both Universal Wall Connectors
and North America Gen 3 Single Phase Wall Connectors. Universal Wall Connectors and Gen
3 Single Phase Wall Connectors can also be mixed and matched in the same daisy
chain.
Tesla recommends daisy chaining Wall Connectors at sites with more than two Wall
Connectors to improve installation costs wherever full power is not always needed.
Implementing this installation process leads to simplification of site design, fewer
materials used, and overall reduced costs. This is particularly effective whenever two
Wall Connectors are mounted on a single pedestal or next to each other on a wall.
The Wall Connector supports daisy chaining of multiple Wall Connectors on a single branch
circuit by feeding additional Wall Connectors from the second set of terminals. In this
arrangement, the wire box of a Wall Connector can be used as a pass-through supply to
the subsequent Wall Connector. Daisy chaining is currently only supported on the
Universal Wall Connector.
The maximum current rating for a daisy chain is 48A, fed by a 60A circuit breaker. All
Wall Connectors in a daisy chain must be configured as a single group power management
unit with a network limit of no more than 48A. The current rating can be configured in
the Tesla One app during the Commissioning Process.
All power conductors in the daisy chain must also be sized to carry the full network
limit current. For example, if the group power management unit current limit is set to
48A, all conductors in the daisy chain must be sized for 48A continuous.
The number of Wall Connectors in a daisy chain should be selected to ensure any minimum
required power levels are maintained. Available current is redistributed equally among
all connected vehicles whenever a new vehicle is plugged or unplugged from a
connector.
Table 1.
1 Wall Connector
2 Daisy chained Wall Connectors
3 Daisy Chained Wall Connectors
4 Daisy Chained Wall
Connectors
240V
208V
240V
208V
240V
208V
240V
208V
48A
11.5 kW
9.9 kW
5.7 kW
4.9 kW
3.8 kW
3.2 kW
2.9 kW
2.5 kW
32 A Group Limit
7.9 kW
6.7 kW
3.8 kW
3.3 kW
2.5 kW
2.2 kW
Not Recommended
24 A Group Limit
5.7 kW
4.9 kW
2.9 kW
2.5 kW
Not Recommended
Not Recommended
Each Wall Connector has three bi-directional terminals in the wirebox: L1, L2, and GND.
Form a daisy-chained network by connecting the cables from each terminal of the Wall
Connector to the corresponding terminal of another wall connector as shown below.
Planning the installation:
Choose a breaker appropriate for the location and circuit size.
Choose the right amperage based on the application of the site.
See the recommended amperage based on the power output and the application
of the site.
Table 2.
Expected Park Time (hours)
Examples
Minimum amperage per wall connector at 100%
utilization
Power
output at 240 volts (kW)
Power
output at 208 volts (kW)
>8+
Overnight parking, airport
12 A min
2.75 kW
2.4 kW
4-8
Long term parking, overnight parking
24 A min
5.7 kW
4.9 kW
Workplace, hospitality
1-3
Shopping and dining
48 A min
11.5 kW
10 kW
For a 6 Wall Connector site, a 225 A breaker panel is preferred. For a single-phase
implementation, see figure below. For a 12 Wall Connector site, a 400 A breaker
panel is preferred.
To implement daisy chaining in a three-phase system, daisy-chained groups of Wall
Connectors should be distributed as evenly as possible among phase pairs as shown in
the figure below.
Examples of Daisy Chain Using a Pedestal
If the Wall Connectors are mounted on a pedestal, drill two openings at the rear
entry locations with a 1-1/8 in (29 mm) step bit. Route the wiring through these
openings and through the pedestal to make the connections.
Examples of Daisy Chain on a Wall Mounted Site
If the Wall Connectors are mounted on a wall, you can utilize either the top or
bottom openings and route the wires through a 1-inch conduit.