Optional: Rear Wire Entry for Stacked Configuration

For stacked configurations, the Powerwall 3 wiring can be concealed by routing it through the back of each unit as follows. This method creates a clean installation that avoids routing the wiring along the sides of the Expansion unit(s) and Powerwall 3.

Required Tools

  • 1-3/8 inch (35 mm) hole saw
  • 2 inch (51 mm) hole saw
Required Supplies
  • (2) 1 inch PVC female adapters
  • (2) RMC close nipples, chase nipple optional
  • (2) locking rings
  • Schedule 80 PVC
  • PVC glue
  • (1) conduit bushing
  1. Before mounting the Expansion unit(s), mark the center of the drilling location on the back of the unit, 2-3/16 inches (82 mm) from the top of the unit and 3-1/2 inches (55 mm) from the side of the unit.
  2. Using a hole saw, drill a 1-3/8 inch (36 mm) hole in the back of the unit.
  3. Install a conduit fitting in the hole.
  4. Connect a 1 inch PVC female adapter to the conduit fitting.
  5. Drill out the 2 inch circle on the back right side of the fan front cover.
    Figure 1. Rear View of Fan Front Cover
  6. Deburr any sharp edges, then install the fan front cover on the Expansion enclosure.
  7. Install the remaining Expansion unit(s) in the stack per Install Stacked Expansion Units, drilling out the conduit entry hole in the back of each unit and fan front cover as described above.
    Note
    It is critical that the units are leveled so that they are aligned and the PVC conduit can be run through the stack.
  8. Measure and cut the required PVC conduit length depending on the number of units being stacked:
    Number of Units in StackPVC Conduit Length
    24 inches (102 mm)
    310 inches (254 mm)
    416 inches (406 mm)
  9. Attach the remaining PVC adapter to one end of the PVC conduit.
  10. Apply PVC glue to the opposite end of the PVC conduit and insert the conduit into the stack. Ensure approximately ½ inch (13 mm) of the adapter is protruding from the fan front cover.
  11. Punch out the rear conduit entry for the Powerwall 3, then install the unit at the front of the stack per Install Stacked Expansion Units.
  12. Install the RMC close nipple (or chase nipple if available) with locking rings in the Powerwall 3.
    Note
    If required by local code, install a bushing on the close nipple / chase nipple.
    Note
    For DC runs, the metal enclosure complies with NEC code exemption 690.31 (D).
    1Conduit fitting with 1 inch PVC female adapter
    2PVC conduit with adapter
    3RMC close nipple (or chase nipple if available) with locking rings
  13. Route the wiring into the Powerwall 3 enclosure.