Current Transformer on Incorrect Phase
- Locate the CT on the Meter page in Setup App.
- Determine which phase the CT should
be measuring.NoteIf using Gateway CTs, the ports are CT 1 (Line 1), CT2, (Line 2), CT 3 (defaults to Line 1 but can be configured as Line 2 in Setup App).NoteIf using a Neurio meter, the ports are A (Line 1), B (Line 2), B (Line 2), A (Line 1) and are determined by voltage reference.
- Verify the CT is measuring the correct phase.
Note
In the examples above, the CT is
monitoring a solar inverter conductor, which is why only (1) CT is required.
Note
In the examples above, the CT is
monitoring a solar inverter conductor, which is why only (1) CT is required.