2026-07-07
Step 1: Array Layout
- 2026-07-07: Updated instructions for Hybrid Interlock compatibility.
Overview
Prepare for installation by marking out array boundaries, module locations, and hardware attachment points.
Prerequisites
Refer to the planset and project information specified in Array Design when preparing the array layout.
Hazards
Safety and PPE
- Safety glasses (ANSI Z87.1 or EN 166)
- Cut-resistant gloves (ANSI Cut Level 3 or EN 388 Level C)
- Closed-toed shoes
- Fall protection equipment (full-body harness with lanyard) for working at height
General Equipment
- Extension ladder, fiberglass (ANSI/ASC Type IA, 300 lb/135 kg rating)
Required Parts and Tools
- Tape measure
- Roof crayon or chalk
Layout
- Inspect and put on fall protection before performing roof work. Ensure that your fall harness is connected to a certified anchor point and maintain 6 ft (2 m) clearance from the roof edge unless guarded.
- Put on cut-resistant gloves and safety glasses.
-
Check planset and lay out the array.
-
Mark out the perimeter of the array and module locations, ensuring that the
boundaries are not within any setbacks or blocked by roof obstructions.
Include a ½ in. gap between modules in both X and Y directions.
NoteMarking Interlock locations and up-roof attachment points for other hooks is recommended.
-
Adjust front row marks to a square reference, typically the eave. Ensure
that the outside corners of the array on the first row are the same distance
from the eave or square reference.
- (A) - Square reference from eave
- (B) - Module Y dimension + ½ in.
- (C) - Module X dimension + ½ in.
NoteFor ideal aesthetics, the down-roof edge of the Front Skirt should align with the overlap in a tile course. To achieve this, lay out the PV modules with the down-roof edge 3 in. above the lip of a tile course so that the Front Skirt is correctly aligned once installed. Modules should always be installed in this manner when allowed by space limitations.- (A) - 3 in. from the lip of the tile course
- Ensure that modules are not installed in the wind setback zone as defined by ASCE 7.
-
Identify the attachment
locations.
-
Locate the tiles to remove for all attachment points in both the X and Y
directions.
NoteHybrid Interlocks are not compatible with Flat Tile Leveling Feet.