Prepare for installation by marking out array boundaries, module locations, and hardware attachment points.

Prerequisites

Refer to the planset and project information specified in Array Design when preparing the array layout.

Hazards

Figure 1. Fall from Height

Safety and PPE

  • Safety glasses (ANSI Z87.1 or EN 166)
  • Cut-resistant gloves (ANSI Cut Level 3 or EN 388 Level C)
  • Closed-toed shoes
  • Fall protection equipment (full-body harness with lanyard) for working at height

General Equipment

  • Extension ladder, fiberglass (ANSI/ASC Type IA, 300 lb/135 kg rating)

Required Parts and Tools

  • Tape measure
  • Roof crayon or chalk

Layout

  1. Inspect and put on fall protection before performing roof work. Ensure that your fall harness is connected to a certified anchor point and maintain 6 ft (2 m) clearance from the roof edge unless guarded.
  2. Put on cut-resistant gloves and safety glasses.
  3. Check planset and lay out the array.
    1. Note ASCE 7 wind and code-prescribed fire setbacks on the roof as defined in previous steps. Be aware of roof obstructions when marking out the array. Refer to Array Design.
      • (A) - Obstruction
      • (B) - Ridge setback
      • (C) - Gable setback
      • (D) - Eave setback
    2. Obstructions may include passive vents, vent pipes, skylights, chimneys, etc. AHJs may allow or prohibit spanning over some obstructions. Take care to minimize array shading from obstructions.
  4. Mark out the perimeter of the array and module locations, ensuring that the boundaries are not within any setbacks or blocked by roof obstructions. Include a ½ in. gap between modules in both X and Y directions.
    Note
    Marking Interlock locations and up-roof attachment points for other hooks is recommended.
  5. Adjust front row marks to a square reference, typically the eave. Ensure that the outside corners of the array on the first row are the same distance from the eave or square reference.
    • (A) - Square reference from eave
    • (B) - Module Y dimension + ½ in.
    • (C) - Module X dimension + ½ in.
    Note
    For ideal aesthetics, the down-roof edge of the Front Skirt should align with the overlap in a tile course. To achieve this, lay out the PV modules with the down-roof edge 3 in. above the lip of a tile course so that the Front Skirt is correctly aligned once installed. Modules should always be installed in this manner when allowed by space limitations.
    • (A) - 3 in. from the lip of the tile course
  6. Ensure that modules are not installed in the wind setback zone as defined by ASCE 7.
  7. Identify the attachment locations.
    1. Locate the rafters that fall within the array perimeter.
    2. Starting with the first rafter inside the perimeter of the array, select a tile over the rafter to remove for placement of the first Tile Hook. Observe setback, spacing, and cantilever rules when selecting the tile.
  8. Locate the tiles to remove for all attachment points in both the X and Y directions.
    Note
    Hybrid Interlocks are not compatible with Flat Tile Leveling Feet.
    1. If a module gap lines up with a rafter location in a Flat Tile system, shift the array so that the module gap is at least 2 inches away from the rafter.