CT Labeling Requirements

The following label must be posted near the installation of CT(s):

  • For Panel Limits, label all Site and Solar CTs (may include Backup Gateway 2 (Meter X and Meter Y) CTs, Backup Switch (Meter Z), Gateway 3 (Meter Z), and/or Remote Energy Meter CTs, excluding CTs installed for Revenue Grade Metering).
  • For Site Limits, label all Site CTs (may include Backup Gateway 2 (Meter X and Meter Y) CTs, Backup Switch (Meter Z), Gateway 3 (Meter Z), and/or Remote Energy Meter CTs).
  • For Conductor Limits, label all Conductor CTs (may include Backup Gateway 2 (Meter X or Meter Y) CTs or Remote Energy Meter CTs).
Figure 1. CT Field Marking Label