Document Revision History

Date Revision Changes
September 22, 2025 1.6 Added new service procedure: Multiple Powerwall 2/Powerwall+ Units to Powerwall 3 Upgrade.
September 16, 2025 1.5 Added new service procedures: Single Powerwall 2 to Powerwall 3 Upgrade and Single Powerwall+ to Powerwall 3 Upgrade.
August 21, 2025 1.4 Added new service procedure: Energize Powerwall 3 System.
June 20, 2025 1.3 Updated Powerwall 3 Lockout/Tagout to include a warning about applying lock and tags when working on the Solar Inverter.
March 26, 2025 1.2 Removed the "De-Energizing Powerwall" procedure as the Powerwall 3 Lockout/Tagout is the main prerequisite procedure for doing work.
February 26, 2025 1.1 Added new topic: Powerwall 3 Lockout/Tagout.
2024-07-01 1.0 Initial publication