STEP 4: Install Backup Gateway 2 Mount the Backup GatewayVerify Neutral-Earth Bonding Scheme and Install Earthing RodMake AC Power Connections to Supply and Load PanelsInstall Powerwall and Generation Breakers in the Backup GatewayConfiguring Powerwall(s) on Three-Phase InstallationsInverter Configuration