Backup Gateway 2 Meters
Internal Primary Meter (Meter X) | Internal Secondary Meter (Meter Y) | |
---|---|---|
Meter Location | ||
Compatible CTs | N/A (captive CTs) | Tesla 100 A CTs (Tesla P/N 1467316-00-x) |
Note As indicated
above, each CT is only compatible with the meter it is designed
to be paired with. CTs cannot be used with any meter other than
the one they are intended for. |
||
CT Capacity | 200 A | 100 A |
Possible Monitoring Assignments | Site, Conductor, None | Site, Solar, Solar CTx2, Conductor, Load, None |
Connection Methods (Meter to Gateway) | Hardwired directly to Backup Gateway 2 Site Controller | CTs connect directly to Backup Gateway 2 Site Controller |
Voltage Reference | Identified and labeled within Backup Gateway 2 | Identified and labeled within Backup Gateway 2. Voltage reference
can be confirmed / referenced to the labeled Gateway terminals
|
Extension Length | N/A (fixed position in Backup Gateway 2) |
Premade Tesla 100 A CT extension (Tesla P/N 1467274-00-x): 10 ft / 3 m |
Splitting CTs | N/A |
N/A (cannot be split / paralleled) |
1 V-ref can be assigned by installer during commissioning, with CT3 assigned to L1 by default (FW 1.48.1+). CT 3 used to monitor the PV source in most scenarios |