As indicated
above, each CT is only compatible with the meter it is designed
to be paired with. CTs cannot be used with any meter other than
the one they are intended for.
CT
Capacity
200 A
100 A
Possible
Monitoring Assignments
Site, Conductor, None
Site, Solar, Solar CTx2, Conductor, Load, None
Connection
Methods (Meter to Gateway)
Hardwired directly to Backup Gateway 2 Site Controller
CTs connect directly to Backup Gateway 2 Site Controller
Voltage
Reference
Identified and labeled within Backup Gateway 2
Identified and labeled within Backup Gateway 2. Voltage reference
can be confirmed / referenced to the labeled Gateway terminals
CT 1 =
L1
CT 2 =
L2
CT 3 = L1 or
L21
Extension
Length
N/A (fixed position in Backup Gateway 2)
Premade Tesla 100 A CT extension (Tesla P/N 1467274-00-x): 10 ft / 3 m 20 AWG or larger twisted pair conductors: max 330 ft / 100 m
Splitting
CTs
N/A
N/A (cannot be split / paralleled) One 100 A CT per terminal
1 V-ref can
be assigned by installer during commissioning, with CT3 assigned to
L1 by default (FW 1.48.1+). CT 3 used to monitor the PV source in
most scenarios