Installing Meters and CTs
For Gateway 3 (Meter Z), Backup Switch (Meter Z), and Backup Gateway 2 Internal Primary Meter (Meter X), there is no additional step required to install the meter or CTs as they are integrated in the equipment. Backup Gateway 2 Internal Secondary Meter is also integrated but CTs must be installed and connected to Meter Y.
Neurio Remote Energy Meters and CTs must be installed when needed.