Backup Switch Meter

Internal Primary Meter (Meter Z)
Meter Location
Compatible CTs N/A (captive CTs)
CT Capacity 200 A
Possible Monitoring Assignments Site
Connection Methods (Meter to Gateway) Installed behind utility meter
Voltage Reference Identified and labeled within the Backup Switch
Extension Length N/A (fixed position in Backup Switch)
Splitting CTs N/A