Meter
Location
|
|
Compatible
CTs
|
N/A (captive CTs) |
CT
Capacity
|
200 A |
Possible
Monitoring Assignments
|
Site |
Connection
Methods (Meter to Gateway)
|
Installed behind utility meter |
Voltage
Reference
|
Identified and labeled within the Backup Switch |
Extension
Length
|
N/A (fixed position in Backup Switch) |
Splitting
CTs
|
N/A |