Select Grid Code and Start System

  1. While connected to Powershare Gateway in Tesla One, select the system Grid Code:
    1. Select Settings, then Grid Code.
    2. Select the Country and Region (state) of the installation.
    3. Select the customer's energy Utility.
    4. If applicable, select the customer's energy Retailer.
    5. Select the Powershare Standard.
    6. Select the Voltage/Frequency for the site.
    7. Select Done. The selected Grid Code will be displayed on the screen.
  2. On the landing page, select Start System.

Device firmware updates will begin automatically. For systems that include Backup Switch, if the utility is installing Backup Switch at a later date, an alert that Backup Switch is not installed will display; this is expected behavior:

This alert will resolve once the utility has installed Backup Switch.