Required Tools
General Tools
- Personal protective equipment (safety glasses, gloves, protective footwear)
- Installation tools (level, stud sensor, tape measure, pencil, painter’s tape, flashlight)
- Smart phone with Tesla One app for performing device setup and documenting the installation
- Drill and drill bit for drilling pilot holes in mounting surface
- Torque wrench / screwdriver with T20 Torx bit
- Wire strippers/cutters for 0.2 mm2 to 120 mm2 wires
- Up to 3 mm electronics tip slotted screwdriver for AC and communication wiring spring terminals
Powerwall 3 Installation Tools
- Powerwall dolly (preferred, Tesla P/N 1856187-xx-y) OR lift equipment capable of lifting and supporting 287 lb (130 kg)
- ¾-inch hex nut or 19 mm drill socket (if using Powerwall dolly)
- Ratcheting strap to secure Powerwall 3 to lift equipment (if not using Powerwall dolly)
- Ratcheting die crimping tool for crimping forked terminals onto PV wiring;
Tesla recommends any of the following or equivalent:
- TE Connectivity P/N 58433-3
- TE Connectivity P/N 59824-1
- Phillips #2 (reduced diameter PR2 or PH2R) screwdriver with minimum 25 mm
shaft length and maximum 5.4 mm tool diameter for the PV wiring terminals
- Multimeter and Loop Impedance Tester
Warning
Powerwall 3 is heavy. Wear appropriate personal protective equipment (such as gloves and
protective footwear) when handling the unit. Only a sufficient number of trained
movers should lift Powerwall 3. Use of lift equipment is recommended.
Backup Gateway Installation Tools
- Small bit for drilling pilot holes in Backup Gateway mounting surface
- Hole saws for drilling cable access holes in Backup Gateway (M12, M20, M25, M32, M40, M50)
- Torque wrench with 3 mm Allen bit (for Backup Gateway power connections)