STEP 4: Install Backup Gateway Mount the Backup GatewayRemove Neutral-Ground Bonding Strap from Backup Gateway if Not Installed as Service EquipmentInstall Main Breaker in Backup GatewayMake AC Power Connections to Supply and Load PanelsInstall Optional Internal Panelboard in the Backup GatewayConnect Powerwall 3 to Backup Gateway