Required Tools
General Tools
- Personal protective equipment (safety glasses, gloves, protective footwear)
- Installation tools (level, stud sensor, tape measure, pencil, painter’s tape, flashlight)
- Smart phone with Tesla One app for performing device setup and documenting the installation
- Drill and drill bit for drilling pilot holes in mounting surface (5/32-inch bit for wood studs)
- Torque wrench / screwdriver with 1/4-inch bit holder and T20 Torx bit
- Wire strippers/cutters for 24 AWG to 250 kcmil (0.2 mm2 to 120 mm2) wires
- Up to 3/32-inch or 3 mm cabinet or electronics tip slotted screwdriver for communication wiring spring terminals
- RJ45 crimper
- Ethernet cable tester
Powerwall 3 Installation Tools
- Powerwall dolly (preferred, Tesla P/N 1856187-xx-y) OR lift equipment capable of lifting and supporting 287 lb (130 kg)
- ¾-inch hex nut or 19 mm drill socket (if using Powerwall dolly)
- Ratcheting strap to secure Powerwall 3 to lift equipment (if not using Powerwall dolly)
- Up to 3/16-inch or 4.5 mm cabinet or electronics tip slotted screwdriver for AC and PV wiring spring terminals
- Multimeter and Loop Impedance Tester
Warning
Powerwall 3 is heavy. Wear appropriate personal protective equipment (such as gloves and
protective footwear) when handling the unit. Only a sufficient number of trained
movers should lift Powerwall 3. Use of lift equipment is recommended.
Powerwall 3 Expansion Installation Tools
- T40 Torx bit
Backup Gateway 2 Installation Tools
- Torque wrench with 1/4-, 3/8-, and 5/16-inch Allen bit (for Backup Gateway 2 power connections)
- Socket wrench with 5/16-inch (8 mm) hex socket