STEP 7: Install Clamp-on Ferrite Cores / Metal PV Shield
Powerwall 3 ships with clamp-on ferrite cores and/or a metal PV shield. Review the following table to learn which parts ship with Powerwall 3 depending on Powerwall 3 part number:
Powerwall 3 P/N 1707000-11-L and 1707000-21-L |
|
Any conduit allowed |
Powerwall 3 P/N 1707000-00-J to 1707000-21-K |
|
Metal conduit required |
Powerwall 3 P/N 1707000-00-H and lower |
|
Metal conduit required |
CAUTION
Ferrite cores are
fragile; handle with caution.
Note
Equipment grounding conductors do
not need to be included in ferrite cores.
- Install the provided small clamp-on ferrite core around the Tesla Asset Controller (TACO) low voltage harness.
- For Powerwall 3 P/N 1707000-11-L and
1707000-21-L, install the large clamp-on ferrite core:
- Install the provided large clamp-on ferrite core around the AC conductors.
- Secure the ferrite core closed with the provided cable tie.
- For Powerwall 3 P/N 1707000-00-J to
1707000-21-K, install the metal PV shield:
- Inspect the PV shield and confirm the metal is not warped or bent.
- Align the bottom edge of the PV shield with the space between the PV connector and the metal enclosure. Push the PV shield into place.
- Confirm the edges of the PV shield do not protrude past the edges of the Powerwall 3 enclosure.
NoteWhen the metal PV shield is installed, additional ferrite cores are not required on the AC and PV wires. - For Powerwall 3 P/N 1707000-00-H and
lower, install the large clamp-on ferrite cores:
- Install one of the provided large clamp-on ferrite cores around the AC conductors.
- Secure the ferrite core closed with the provided cable tie.
- Install one of the provided large clamp-on ferrite cores around the PV conductors.
- Secure the ferrite core closed with the provided cable tie.