Configure Meters and CTs
Select System then select the Metering tab to configure meters and CTs. Once configured, the Metering tab displays all physical meters with a summary of what each meter is measuring.
Note
For systems with multiple Tesla Solar
Inverters, install one remote energy meter for Site metering paired with one Solar
Inverter. For the additional Solar Inverter(s), a Negative Load alert during
device setup is expected behavior, but all metering is still calculated and displayed
correctly in the customer's Tesla mobile app.
