19/06/2023 10:52:33
Step 7: Turn On and Configure the System
- Switch on the AC circuit breakers for Powerwall+ and each Powerwall.
- Switch on each Powerwall+ and Powerwall by moving the Enable switch on the right (LED) side of the unit to the ON position. When Powerwall+ and each Powerwall are enabled and communicating with the Backup Switch, the LED on the right side of Powerwall illuminates.
-
See Perform Device Setup for
instructions on updating system firmware and performing device setup.
NoteDuring device setup, ensure that when scanning for Powerwall+ and Powerwalls, the Device page shows all units in the system.
- After installation is complete, remove the protective film from the Powerwall.