Step 7: Turn On and Configure the System

  1. Switch on the AC circuit breakers for Powerwall+ and each Powerwall.
  2. Switch on each Powerwall+ and Powerwall by moving the Enable switch on the right (LED) side of the unit to the ON position. When Powerwall+ and each Powerwall are enabled and communicating with the Backup Switch, the LED on the right side of Powerwall illuminates.
  3. See Perform Device Setup for instructions on updating system firmware and performing device setup.
    Informational PurposesAn informational icon, calling your attention
    Note
    During device setup, ensure that when scanning for Powerwall+ and Powerwalls, the Device page shows all units in the system.
  4. After installation is complete, remove the protective film from the Powerwall.