Whole-Home Backup
- All loads and generation are downstream of the Backup Gateway 2 contactor.
- Site-level metering is performed by integrated Site CTs.
- Internal panelboard kit may be used for Generation breakers.
- Neutral-Ground Bonding Strap installed only if Gateway is Service Equipment.

Note
Powerwall+ can be landed at the Backup
Gateway internal panelboard, as shown above, or at an external generation panel as
shown in Partial Home Backup with
Standalone Meter.

Note
This
configuration is pictured with two additional Powerwall units.