Whole-Home Backup
- All loads and generation are downstream of the Backup Gateway 2 contactor.
- Site-level metering is performed by integrated Site CTs.
- Internal panelboard kit may be used for Generation breakers.
- Neutral-Ground Bonding Strap installed only if Gateway is Service Equipment.