Appendix D: Inverter Settings

      Inverter settings must be configured in advance by Tesla. Talk to your Tesla representative if any of the default settings should be modified. The defaults for the inverter follow each region’s grid code.

      • Voltage Ride-Through
      • Frequency Ride-Through
      • Accuracy
      • Other Function Parameters
      • Powerwall+ Installation Manual with Backup Gateway 2
      • General Warnings and Information
      • Specifications
        • Powerwall+ Specifications
        • Mid Circuit Interrupter Specifications (P/N MCI-1) PV Rapid Shutdown Equipment (PVRSE)
        • Mid Circuit Interrupter Specifications (P/N MCI-2) PV Rapid Shutdown Equipment (PVRSE)
        • Backup Gateway 2 Specifications
      • Registering Powerwall+
      • Powerwall+ Overview
      • Site Requirements and Pre-Install Guidance
        • Powerwall+ with Backup Gateway 2 Installation Requirements
        • Powerwall+ Physical Requirements
        • Powerwall+ Operating Temperature Range
      • Preparing for Installation
        • In the Powerwall+ Packaging
        • In the Backup Gateway 2 Box
          • In the Backup Gateway 2 Accessory Bag
        • Required Tools
        • Required Supplies
        • Service Parts, Orderable Parts, and Accessory Kits
          • Powerwall+ Service Parts, Orderable Parts, and Accessories
          • Backup Gateway 2 Service Parts, Orderable Parts, and Accessories
      • STEP 1: Plan the Installation Site
        • Choose a Location
        • Choose Solar Assembly Cable Entry
        • Choose Backup Gateway Cable Entry
        • Plan Wiring Method
        • Plan the Electrical Service Connection to Backup Gateway
        • Plan Distance Between Components
      • STEP 2: Mount Powerwall+ and the Gateway
        • Anchor the Powerwall+ Mounting Brackets
        • Mount the Battery Assembly on the Bracket
        • Mount the Solar Assembly
        • Mount the Backup Gateway
      • STEP 3: Connect the Solar and Battery Assemblies
      • STEP 4: Make Solar DC Connections
        • Install Mid-Circuit Interrupters in PV Array
        • Test PV Strings with MCIs
        • Make DC Power Connections
        • Install MPPT Paralleling Jumpers (Optional)
      • STEP 5: Configure and Wire the Backup Gateway
        • Remove Neutral-Ground Bonding Strap from Backup Gateway if Not Installed as Service Equipment
        • Install Main Breaker in Backup Gateway
        • Make AC Power Connections to Supply and Load Panels
        • Install Optional Internal Panelboard in the Backup Gateway
      • STEP 6: Connect Powerwall+ and Backup Gateway
        • Make Powerwall+ AC Power Connections
        • Connect Powerwall+ to the Backup Gateway
      • STEP 7: Install System Shutdown Switch
      • STEP 8: Install Energy Metering for the System
        • About Energy Metering
        • Site and Solar Metering for Backup Gateway 2
          • Install Tesla 100 A CTs
            • UL 1741 PCS Requirements
              • Panel Limit Feature
      • STEP 9: Complete the Installation
        • Plan Internet Connection for Backup Gateway 2
        • Unplug Solar Assembly Site Controller Power Harness
        • Close the Wiring Compartments and Turn the System On
        • Perform Device Setup
        • Finish and Demonstrate the Installation
        • Technical Support
        • Maintenance
      • Appendix A: Powerwall+ Mounting Details
        • Powerwall+ Space Requirements
        • Powerwall+ Anchoring Details
        • Mounting Bracket Anchoring Details
        • Concrete Pad Details for Ground-mounting Powerwall+ on Pre-Cast Concrete Pad an Existing Structural Wall
        • Anchoring and Concrete Pad Details for Ground-mounting Powerwall+ on Poured Concrete with Steel Posts
      • Appendix B: Wiring Reference
        • Powerwall+ Wiring
          • Solar Assembly and Battery Assembly Connections
          • Battery Assembly Wiring
          • Solar Assembly Wiring
        • Backup Gateway 2 Wiring
          • Backup Gateway 2 Communication Wiring
          • Acceptable Circuit Breakers
          • System Shutdown Switch Connected to Backup Gateway
      • Appendix C: System Wiring Diagrams
        • Overview
        • Whole-Home Backup
        • Partial-Home Backup
      • Appendix D: Inverter Settings
        • Voltage Ride-Through
        • Frequency Ride-Through
        • Accuracy
        • Other Function Parameters
      • Appendix E: Solar Assembly Rapid Shutdown
        • Rapid Shutdown Initiation
        • Self-Test Function
        • Rapid Shutdown Initiator Label
          • RSD Initiator Label Location
      • Appendix F: System Energy Metering
        • Installing a Neurio Remote Energy Meter
          • Wireless Communication to the Backup Gateway 2
          • Wired Communication to the Backup Gateway
          • Meter Voltage Taps
          • Voltage Tap and Current Transformer Connections
          • Meter Placement and CT Wire Lengths
          • Current Transformer Placement
          • Current Transformer Orientation
          • Current Transformer Capacity
          • Installing the Meter
      • Appendix G: Feature Notes
        • Configuring Site Limits
        • Configuring Conductor Export Limits
        • Load Shedding
      • Appendix H: Installation Troubleshooting
        • Updating Firmware
        • Configuring Energy Meters
        • Reset the Backup Gateway
        • Power Cycle the System
      • Appendix I: Safety Features
        • Arc Fault Detection and Protection
        • Ground Fault Protection
        • Protective Earth Impedance Check
        • System LED Behavior
          • Powerwall+ LED Behavior
          • Neurio Meter LED Behavior
      • Appendix J: Installing the Cold Weather Kit
      • Appendix K: Multi Powerwall+ Installations
        • Multi-Powerwall+ Systems
        • Powerwall+ Systems with Powerwall 2 AC
          • Side by Side Installations
          • Stacked Installations
            • In the Powerwall Stack Kit
            • Required Tools
            • Site Requirements
            • Installation Instructions
              • Step 1: Prepare for Installation
              • Step 2: Choose a Wiring Option
              • Step 3: Prepare for Concealed Wiring
              • Step 4: Join the Units
              • Step 5: Wire the Powerwall Units
              • Step 6: Close the Wiring Compartments and Replace the Covers
              • Step 7: Turn On and Configure the System
      • Appendix L: Shutting Down Powerwall+
      • Appendix M: Servicing Powerwall+
        • Servicing the Solar Assembly
      • Appendix N: Revision Log
      • © Tesla 2025
      • Submit Feedback