System LED Behavior

      • Powerwall+ LED Behavior
      • Neurio Meter LED Behavior
      Parent topic: Appendix I: Safety Features
      • Powerwall+ Installation Manual with Backup Gateway 2
      • General Warnings and Information
      • Specifications
        • Powerwall+ Specifications
        • Mid Circuit Interrupter Specifications (P/N MCI-1) PV Rapid Shutdown Equipment (PVRSE)
        • Mid Circuit Interrupter Specifications (P/N MCI-2) PV Rapid Shutdown Equipment (PVRSE)
        • Backup Gateway 2 Specifications
      • Registering Powerwall+
      • Powerwall+ Overview
      • Site Requirements and Pre-Install Guidance
        • Powerwall+ with Backup Gateway 2 Installation Requirements
        • Powerwall+ Physical Requirements
        • Powerwall+ Operating Temperature Range
      • Preparing for Installation
        • In the Powerwall+ Packaging
        • In the Backup Gateway 2 Box
          • In the Backup Gateway 2 Accessory Bag
        • Required Tools
        • Required Supplies
        • Service Parts, Orderable Parts, and Accessory Kits
          • Powerwall+ Service Parts, Orderable Parts, and Accessories
          • Backup Gateway 2 Service Parts, Orderable Parts, and Accessories
      • STEP 1: Plan the Installation Site
        • Choose a Location
        • Choose Solar Assembly Cable Entry
        • Choose Backup Gateway Cable Entry
        • Plan Wiring Method
        • Plan the Electrical Service Connection to Backup Gateway
        • Plan Distance Between Components
      • STEP 2: Mount Powerwall+ and the Gateway
        • Anchor the Powerwall+ Mounting Brackets
        • Mount the Battery Assembly on the Bracket
        • Mount the Solar Assembly
        • Mount the Backup Gateway
      • STEP 3: Connect the Solar and Battery Assemblies
      • STEP 4: Make Solar DC Connections
        • Install Mid-Circuit Interrupters in PV Array
        • Test PV Strings with MCIs
        • Make DC Power Connections
        • Install MPPT Paralleling Jumpers (Optional)
      • STEP 5: Configure and Wire the Backup Gateway
        • Remove Neutral-Ground Bonding Strap from Backup Gateway if Not Installed as Service Equipment
        • Install Main Breaker in Backup Gateway
        • Make AC Power Connections to Supply and Load Panels
        • Install Optional Internal Panelboard in the Backup Gateway
      • STEP 6: Connect Powerwall+ and Backup Gateway
        • Make Powerwall+ AC Power Connections
        • Connect Powerwall+ to the Backup Gateway
      • STEP 7: Install System Shutdown Switch
      • STEP 8: Install Energy Metering for the System
        • About Energy Metering
        • Site and Solar Metering for Backup Gateway 2
          • Install Tesla 100 A CTs
            • UL 1741 PCS Requirements
              • Panel Limit Feature
      • STEP 9: Complete the Installation
        • Plan Internet Connection for Backup Gateway 2
        • Unplug Solar Assembly Site Controller Power Harness
        • Close the Wiring Compartments and Turn the System On
        • Perform Device Setup
        • Finish and Demonstrate the Installation
        • Technical Support
        • Maintenance
      • Appendix A: Powerwall+ Mounting Details
        • Powerwall+ Space Requirements
        • Powerwall+ Anchoring Details
        • Mounting Bracket Anchoring Details
        • Concrete Pad Details for Ground-mounting Powerwall+ on Pre-Cast Concrete Pad an Existing Structural Wall
        • Anchoring and Concrete Pad Details for Ground-mounting Powerwall+ on Poured Concrete with Steel Posts
      • Appendix B: Wiring Reference
        • Powerwall+ Wiring
          • Solar Assembly and Battery Assembly Connections
          • Battery Assembly Wiring
          • Solar Assembly Wiring
        • Backup Gateway 2 Wiring
          • Backup Gateway 2 Communication Wiring
          • Acceptable Circuit Breakers
          • System Shutdown Switch Connected to Backup Gateway
      • Appendix C: System Wiring Diagrams
        • Overview
        • Whole-Home Backup
        • Partial-Home Backup
      • Appendix D: Inverter Settings
        • Voltage Ride-Through
        • Frequency Ride-Through
        • Accuracy
        • Other Function Parameters
      • Appendix E: Solar Assembly Rapid Shutdown
        • Rapid Shutdown Initiation
        • Self-Test Function
        • Rapid Shutdown Initiator Label
          • RSD Initiator Label Location
      • Appendix F: System Energy Metering
        • Installing a Neurio Remote Energy Meter
          • Wireless Communication to the Backup Gateway 2
          • Wired Communication to the Backup Gateway
          • Meter Voltage Taps
          • Voltage Tap and Current Transformer Connections
          • Meter Placement and CT Wire Lengths
          • Current Transformer Placement
          • Current Transformer Orientation
          • Current Transformer Capacity
          • Installing the Meter
      • Appendix G: Feature Notes
        • Configuring Site Limits
        • Configuring Conductor Export Limits
        • Load Shedding
      • Appendix H: Installation Troubleshooting
        • Updating Firmware
        • Configuring Energy Meters
        • Reset the Backup Gateway
        • Power Cycle the System
      • Appendix I: Safety Features
        • Arc Fault Detection and Protection
        • Ground Fault Protection
        • Protective Earth Impedance Check
        • System LED Behavior
          • Powerwall+ LED Behavior
          • Neurio Meter LED Behavior
      • Appendix J: Installing the Cold Weather Kit
      • Appendix K: Multi Powerwall+ Installations
        • Multi-Powerwall+ Systems
        • Powerwall+ Systems with Powerwall 2 AC
          • Side by Side Installations
          • Stacked Installations
            • In the Powerwall Stack Kit
            • Required Tools
            • Site Requirements
            • Installation Instructions
              • Step 1: Prepare for Installation
              • Step 2: Choose a Wiring Option
              • Step 3: Prepare for Concealed Wiring
              • Step 4: Join the Units
              • Step 5: Wire the Powerwall Units
              • Step 6: Close the Wiring Compartments and Replace the Covers
              • Step 7: Turn On and Configure the System
      • Appendix L: Shutting Down Powerwall+
      • Appendix M: Servicing Powerwall+
        • Servicing the Solar Assembly
      • Appendix N: Revision Log
      • © Tesla 2025
      • Submit Feedback