1.0 |
2021-04-20 |
Initial release |
1.1 |
2021-05-16 |
- Added UL 1741 PCS requirements to energy metering section
- Added Neurio meter installation appendix
|
1.2 |
2021-06-01 |
- Updated multi-Powerwall+ wiring
instructions
- Corrected minimum
fastener size in Mounting Bracket Anchoring Details
|
1.3 |
2021-06-24 |
|
1.4 |
2021-06-27 |
|
1.5 |
2021-08-05 |
|
1.6 |
2021-08-23 |
|
1.7 |
2021-10-12 |
- Updated with
latest Compliance information
- Added
instructions for multi-Powerwall+
installations
|
1.8 |
2021-11-03 |
|
1.9 |
2021-12-15 |
|
1.10 |
2022-01-13 |
|
1.11 |
2022-02-16 |
- Updated Stacked Installations to reflect that Powerwall+ can be
stacked with only one Powerwall
- Corrected type
and size of screwdriver required to spring wiring terminals for
Powerwall+ AC and DC
wiring terminals (up to 3 mm or 3/32 inch cabinet tip or
electronics tip slotted screwdriver) and communications wiring
terminals (up to 3 mm or 1/8 inch cabinet tip or electronics tip
slotted screwdriver)
- Updated Install Mid-Circuit Interrupters in PV Array to reflect that systems using certified PV
modules and mounting systems are covered by Tesla's UL 3741
certification if they are in compliance with the PVHCS listing
instructions
|
1.12 |
07-11-2022 |
|
1.13 |
10-07-2022 |
|
1.14 |
01-26-2023 |
|
1.15 |
03-03-2023 |
|
1.16 |
04-21-2023 |
|
1.17 |
06-22-2023 |
|
1.18 |
08-31-2023 |
|
1.19 |
10-12-2023 |
|
1.20 |
01-16-2024 |
|
1.21 |
03-17-2024 |
|
1.22 |
04-29-2024 |
- Updated MCI Locations to include guidance for Ecofasten systems,
updated section for clarity
|
1.23 |
07-02-2024 |
|
1.24 |
07-24-2024 |
|
1.25 |
10-25-2024 |
|