Appendix N: Revision Log

Revision Date Description
1.0 2021-04-20 Initial release
1.1 2021-05-16
  • Added UL 1741 PCS requirements to energy metering section
  • Added Neurio meter installation appendix
1.2 2021-06-01
  • Updated multi-Powerwall+ wiring instructions
  • Corrected minimum fastener size in Mounting Bracket Anchoring Details
1.3 2021-06-24
1.4 2021-06-27
1.5 2021-08-05
1.6 2021-08-23
1.7 2021-10-12
  • Updated with latest Compliance information
  • Added instructions for multi-Powerwall+ installations
1.8 2021-11-03
1.9 2021-12-15
1.10 2022-01-13
1.11 2022-02-16
  • Updated Stacked Installations to reflect that Powerwall+ can be stacked with only one Powerwall
  • Corrected type and size of screwdriver required to spring wiring terminals for Powerwall+ AC and DC wiring terminals (up to 3 mm or 3/32 inch cabinet tip or electronics tip slotted screwdriver) and communications wiring terminals (up to 3 mm or 1/8 inch cabinet tip or electronics tip slotted screwdriver)
  • Updated Install Mid-Circuit Interrupters in PV Array to reflect that systems using certified PV modules and mounting systems are covered by Tesla's UL 3741 certification if they are in compliance with the PVHCS listing instructions
1.12 07-11-2022
1.13 10-07-2022
1.14 01-26-2023
1.15 03-03-2023
1.16 04-21-2023
1.17 06-22-2023
1.18 08-31-2023
1.19 10-12-2023
1.20 01-16-2024
1.21 03-17-2024
1.22 04-29-2024
  • Updated MCI Locations to include guidance for Ecofasten systems, updated section for clarity
1.23 07-02-2024
1.24 07-24-2024
1.25 10-25-2024