STEP 8: Install Side Skirts

  1. Install double key zeps.
    Install a Double Key Zep 12 inches from each end of the Array Skirt. Each Array Skirt should have two Double Key Zeps installed on it. Only install interlocks between multiple side skirts if panels cannot be aligned correctly and feature a visible gap.
  2. Install side skirt.
    Using the Zep Offset Tool, install the skirt to the side of the array. The notch in the Zep Offset Tool indicates Position 3.