Solar PV Retrofit Installation

      • ZS Comp Installation Manual
      • ZS Span Installation Manual
      • ZS Seam Installation Manual
      • ZS Ramp Installation Manual
      • Approved Sealants
      • What's New
      • Disclaimer of Liability, Notices, Contact Information
      • How to Use This Manual
      • Solar PV Retrofit Installation
        • ZS Comp Installation Manual
          • Important Safety Instructions
          • Introduction to ZS Comp
          • Core Components
          • Array-Building Overview
          • STEP 1: Array Layout
          • STEP 2: Install Comp Mount
          • STEP 3: Install Leveling Feet
          • STEP 4: Install Array Skirt
          • STEP 5: Install PV Modules (SKIMBL)
          • STEP 6: Install Side Skirts
          • STEP 7: Install Corner Caps
          • Appendix A: Allowable Mounting System Loading
          • Appendix B: Wire Management Recommendations
          • Appendix C: Grounding and Bonding
          • Appendix D: Thermal Expansion
          • Appendix E: Module Servicing
        • ZS Span Installation Manual
          • Important Safety Instructions
          • Introduction to ZS Span
          • Core Components
          • STEP 1: Array Layout
          • STEP 2: Install Mighty Hook V2
            • Replacement Flashing Installation
          • STEP 3: Install Splice Assembly Kit
          • STEP 4: Install Cam Foot
          • STEP 5: Install Spanner Clamp
          • STEP 6: Install Array Skirt
          • STEP 7: Install PV Modules
          • STEP 8: Install Side Skirts
          • STEP 9: Install Corner Caps
          • Appendix A: Allowable Mounting System Loading
          • Appendix B: Wire Management Recommendations
          • Appendix C: Grounding and Bonding
          • Appendix D: Thermal Expansion
          • Appendix E: Module Servicing
        • ZS Seam Installation Manual
          • Important Safety Instructions
          • Introduction to ZS Seam
          • Core Components
          • STEP 1: Array Layout
          • STEP 2: Install Seam Mounts
          • STEP 3: Install First Row Leveling Feet
          • STEP 4: Install Array Skirt
          • STEP 5: Install First Row of PV Modules
          • STEP 6: Install the Remaining Rows of Modules
          • STEP 7: Install Side Skirts
          • STEP 8: Install Corner Caps
          • Appendix A: Allowable Mounting System Loading
          • Appendix B: Wire Management Recommendations
          • Appendix C: Grounding and Bonding
          • Appendix D: Thermal Expansion
          • Appendix E: Module Servicing
        • ZS Ramp Installation Manual
          • Important Safety Instructions
          • Introduction to ZS Ramp
          • Core Components
          • STEP 1: Layout and Preparation
          • STEP 2: Install Base Feet
          • STEP 3: Install Mechanical Tubing
          • STEP 4: Install Brackets, Rails and Post Mount
          • STEPS 5 & 6: Install Cross Bracing (As Needed)
          • STEP 7: First Row Cam Feet
          • STEP 8: Install First Row Modules
          • STEP 9: Complete First Row Modules
          • STEP 10: Complete the Remaining Modules
          • STEP 11: Install the Sealing Ring
          • Appendix A: Allowable Mounting System Loading
          • Appendix B: Wire Management Recommendations
          • Appendix C: Grounding and Bonding
          • Appendix D: Thermal Expansion
          • Appendix E: Module Servicing
        • Approved Sealants
      • References
        • Field-Made MC4 Quick Guide
      • Document Revision History
      • © Tesla 2025
      • Submit Feedback