Revision History

Revision Date Description
1.15 May 22, 2025
1.14 April 22, 2025
1.13 February 21, 2025
1.12 November 20, 2024
1.11 November 15, 2024
1.10 October 17, 2024
1.9 October 1, 2024 Updated Add Follower Powerwall 3 and/or Expansion Units to include instructions for commissioning a system with Expansion units
1.8 August 28, 2024 Added Perform E-Stop Test
1.7 July 24, 2024 Added Configure Powerwall 3 Maximum Power / Current Output
1.6 July 3, 2024 Added Optional: Edit or Disable Panel Limit
1.5 May 29, 2024
1.4 April 18, 2024
1.3 March 20, 2024
1.2 February 22, 2024
1.1 January 26, 2024
1.0 October 12, 2023 Initial publication for direct installers