Configure Backup Switch (Meter Z)

Meter Z has two CTs, with the following voltage references:
  • CT 1: L1
  • CT 2: L2

Meter Z CTs can only be configured to measure Site.

  1. Review the vitals for each CT (voltage, current, and power factor) to confirm they have been installed and configured correctly.
    Informational PurposesAn informational icon, calling your attention
    Note
    The live power flow and current readings are available for each CT in real time, as well as an overview of all meters and CT settings, in the Metering tab.