Install Main Breaker in Powershare Gateway
When Powershare
Gateway is installed as Service Equipment, a main breaker must be installed.
- Remove the S1 and S2 supply lugs
using a 7/16-inch hex socket. Recycle the lug divider.
- Install an Eaton or Square D main
breaker (see Acceptable Circuit
Breakers for all compatible breakers):
Action Square D Main Breaker Only Install the Square D lug divider (Tesla P/N 2065063-xx-y). Remove and discard the fastener included with the Square D main breaker. It will not be used. NoteIf a main breaker knockout is punched out but not used, the deadfront must be replaced.