Commissioning Pre-Checks

Miswiring

The following installation mistakes can present a safety hazard or cause damage to customer equipment and must be double-checked before system energization:
  • Swapped line & neutral conductors (to the Powershare Gateway, load panels, or Wall Connector.)
  • Disconnected / loose neutral (between the Powershare Gateway and load panel, or to individual loads.)
  • Swapped neutral / ground
  • Incorrectly bonded neutral-ground
  • Ensure that all conduit junctions and cable entry points are secure and properly sealed.

Before closing equipment, double check all wiring terminations and torque values.