Partial-Home Backup Diagrams

  • Neutral-Ground Bonding Screw is removed when Gateway is not used as service entrance equipment.
  • The diagrams below show the breaker for the Wall Connector being installed inside of Powershare Gateway. This breaker can also being installed inside of a load center that is located downstream of the Gateway.
Figure 1. Partial Home Backup with Detached Meter and Main Panel - Wiring Diagram