Remove the Main
Neutral-Ground Bonding Screw from Powershare
Gateway if Not Installed as Service Equipment
Proper earth connection and neutral-to-ground bonding is required for safe
operation of the system and for compliance with local code requirements. There must be
exactly one Neutral-Earth bond in the electrical panel closest to the utility feed.
Warning
To ensure safe operation in Backup Mode, a local earth connection must
be present on the site such as by earth rod or ground electrode. Connection of earth rod
must comply with local codes.
Gateway Installed as Service Equipment (Contains Main Breaker)
When Powershare
Gateway includes the main service disconnect, it must contain the Neutral-Earth bond, so
the factory-installed main neutral-ground bonding screw must be left installed.Figure 1. Neutral-Ground Bonding
Screw Installed from Factory
Gateway NOT Installed as Service Equipment (Panel Upstream of Gateway)
When Powershare
Gateway does not include the main service
disconnect (when there is an electrical panel upstream of the Gateway), the
factory-installed main neutral-ground bonding screw must be removed.Figure 2. Neutral-Ground Bonding
Screw Removed
If removing the bonding
screw, use a 7/16-inch socket to remove the main neutral-ground bonding
screw.
If replacing the main
neutral-ground bonding screw, torque to 80 in-lbs (9 N-m).